Search results
from HTYP, the free directory anyone can edit if they can prove to me that they're not a spambot
Page title matches
- ...avbar />{{#lst:Durham, NC|navbar}}: [[NC 147]]: [[NC 147 pedestrian bridge|pedestrian bridge]]<section end=navbar /> ...ridges]][[category:pedestrian]]This page is about the currently barricaded pedestrian bridge over [[NC 147]] in [[Durham, NC]].{{seed}} ...635 bytes (86 words) - 20:32, 5 December 2007
Page text matches
- ...avbar />{{#lst:Durham, NC|navbar}}: [[NC 147]]: [[NC 147 pedestrian bridge|pedestrian bridge]]<section end=navbar /> ...ridges]][[category:pedestrian]]This page is about the currently barricaded pedestrian bridge over [[NC 147]] in [[Durham, NC]].{{seed}} ...635 bytes (86 words) - 20:32, 5 December 2007
- ...ng a contiguous [[American Tobacco Trail]], but the long-awaited [[/bridge|pedestrian bridge]] was finally opened on 2014-02-20, connecting the {{l/same|south Du The pedestrian bridge as well as the portions of trail connecting it northward to the form ...2 KB (336 words) - 18:48, 10 April 2014
- [[thing type::pedestrian trail]] [[West Ellerbe Creek Trail]] is a bicycle/pedestrian trail in [[Durham, NC]] that currently runs [https://www.openstreetmap.org/ ...3 KB (474 words) - 23:50, 15 April 2022
- ...C/Durham/roads/Fayetteville|Fayetteville Rd.]]''' (busy; traffic light and pedestrian crossing light/button) ...was widened, but The Hypertwins still think that the city should put in a pedestrian/bike crossing a little way uphill of [[Cardinal Self-Storage South|Cardinal ...3 KB (481 words) - 00:00, 16 July 2010
- * [http://www.bikewalkdurham.org/ Durham Bicycle and Pedestrian Advisory Commission] ...927 bytes (127 words) - 20:08, 14 July 2011
- The pedestrian bridge over [[I-40]] connects the [[../../south Durham|south Durham]] secti ...1,002 bytes (134 words) - 22:28, 22 February 2014
- * '''[[/I-40|I-40]]''': pedestrian bridge now complete! The [[American Tobacco Trail]] (ATT) is bike-and-pedestrian pathway running from the south edge of downtown [[Durham, NC]] and forming ...6 KB (900 words) - 18:51, 10 April 2014
- ...Project - Phase E from N.C. 54 South to the Chatham County Line Trail and Pedestrian Bridge over I-40] ...2 KB (243 words) - 19:01, 20 September 2010
- The [[Ellerbe Creek Trail]] is a bike/pedestrian trail which runs along [[Ellerbe Creek]] and [[South Ellerbe Creek]] (follo ...2 KB (320 words) - 12:17, 14 August 2022
- * an outdoor "streets" section which seems modeled after a downtown pedestrian-only shopping district in a large American city (but with perhaps a dash of ...2 KB (374 words) - 22:06, 4 May 2010
- ...rive''' on the left, across the street), cross 54 (there's no crosswalk or pedestrian signal, so you have to wait for the traffic light and watch for vehicles tu ...connectors are finished; on the north side (will eventually connect to the pedestrian bridge) you end up in the middle of a small stretch of woods just south of ...6 KB (1,007 words) - 20:26, 19 May 2013
- * under I-85, accompanied by the pedestrian tunnel which is part of the Trail ...5 KB (848 words) - 00:16, 16 October 2022
- * [http://www.bikewalkdurham.org/ Bicycle and Pedestrian Advisory Commission] ...20 KB (2,615 words) - 12:19, 15 September 2022
