Difference between revisions of "West Ellerbe Creek Trail"

from HTYP, the free directory anyone can edit if they can prove to me that they're not a spambot
Jump to navigation Jump to search
(updated & edited for consistency; also changed layout to put "about" at top (ish) and "navigation" on right.)
Line 6: Line 6:
 
[[category:US/NC/Durham/trails]]
 
[[category:US/NC/Durham/trails]]
 
</hide>
 
</hide>
 +
{|
 +
|-
 +
| valign=top |
 +
==About==
 +
[[West Ellerbe Creek Trail]] is a bicycle/pedestrian trail in [[Durham, NC]] that currently runs [https://www.openstreetmap.org/#map=17/36.02313/-78.92925 from] {{l/sub|Indian Trail Park|pfx=US/NC/Durham/}} (off Albany Street near the eastern edge of [[Hillandale Golf Course]]) east-northeast along the western portion of [[Ellerbe Creek]] to [https://www.openstreetmap.org/#map=19/36.03541/-78.90967 intersect with] [[Stadium Drive Trail]].
 +
===I-85 tunnel===
 +
A highlight of the trail is the tunnel under I-85 between Guess Road and the [[North Pointe Shopping Mall]]. Although the tunnel itself was build in the twenty-aughts, the trail did not open until 2018. Here's what happened:
 +
* Right-of-way along [[Ellerbe Creek]] northeast of the tunnel was donated in the 1990s by the shopping centers on its east side.
 +
* The tunnel itself was built during the remodeling of I-85 sometime between 2003 and 2009 (circa 2005, but not sure of exact year).
 +
* The trail's design phase was complete by 2010-07-15, but no funding for construction was available.
 +
* By the time construction funding ''was'' first available, the course of the stream had shifted so that the planned path route caused environmental issues and had to be re-planned.
 +
** New (as of 2014) water-quality rules were also a barrier to construction.
 +
* A new route was designed, construction funding was obtained, and the section was open by 2018-03-04.
 +
| valign=top |
 
==Navigation==
 
==Navigation==
 
[[Earth]]: [[United States]]: [[North Carolina]]: {{instate|Durham|NC}}: [[West Ellerbe Creek Trail]]
 
[[Earth]]: [[United States]]: [[North Carolina]]: {{instate|Durham|NC}}: [[West Ellerbe Creek Trail]]
Line 15: Line 29:
 
** '''south-southwest''': [[Hillandale Golf Course]] / {{l/sub|Indian Trail Park|pfx=US/NC/Durham/}}
 
** '''south-southwest''': [[Hillandale Golf Course]] / {{l/sub|Indian Trail Park|pfx=US/NC/Durham/}}
 
** '''north-northeast''' to {{l/sub|Westover Park|pfx=US/NC/Durham/}} (Maryland Avenue) ([http://www.ci.durham.nc.us/gis_apps/parkapp/park.cfm?selVal=park&ParkNam=Westover+Park listing])
 
** '''north-northeast''' to {{l/sub|Westover Park|pfx=US/NC/Durham/}} (Maryland Avenue) ([http://www.ci.durham.nc.us/gis_apps/parkapp/park.cfm?selVal=park&ParkNam=Westover+Park listing])
* '''completed 2018''': from Westover Park (between Guess Road and Maryland Ave.), under [[I-85]] and ending at [[Ellerbe Creek Trail]] on Stadium Drive
+
* '''completed 2018''': from Westover Park (between Guess Road and Maryland Ave.), under [[I-85]] and ending at [[Stadium Drive Trail]] on Stadium Drive
** the tunnel under I-85 was built during the remodeling thereof prior to 2010
+
|}
** the design phase was complete by 2010-07-15, and  the right-of-way along [[Ellerbe Creek]] northeast of this portion had been acquired, but no funding for construction was available
 
** By the time construction funding was first available, the course of the stream had shifted so that the planned path route caused environmental issues and had to be re-planned.
 
** A new route was designed, construction funding was obtained, and the section was open by 2018-03-04.
 
 
 
==About==
 
[[West Ellerbe Creek Trail]] is a bicycle/pedestrian trail in [[Durham, NC]] that currently runs from Perennial Drive (off Albany Street near the eastern edge of [[Hillandale Golf Course]]) through {{l/sub|Indian Trail Park|pfx=US/NC/Durham/}} east-northeast along the western portion of [[Ellerbe Creek]] to Maryland Avenue (the western edge of the very small {{l/sub|Westover Park|pfx=US/NC/Durham/}}).
 
 
 
A longer section continuing along the creek through Westover Park, across Guess Road, under [[I-85]], and connecting with the main [[Ellerbe Creek Trail]] has been designed but not yet built. It will run through a tunnel under [[I-85]] which was built during highway widening circa 2005. Right-of-way along the creek was donated in the 1990s by the shopping centers on its east side, but the creek shifted in the years before funding was available to build the trail. New water-quality rules are currently (2014) a barrier to construction.
 
 
==Links==
 
==Links==
 
===Reference===
 
===Reference===

Revision as of 23:44, 15 April 2022

About

West Ellerbe Creek Trail is a bicycle/pedestrian trail in Durham, NC that currently runs from Indian Trail Park (off Albany Street near the eastern edge of Hillandale Golf Course) east-northeast along the western portion of Ellerbe Creek to intersect with Stadium Drive Trail.

I-85 tunnel

A highlight of the trail is the tunnel under I-85 between Guess Road and the North Pointe Shopping Mall. Although the tunnel itself was build in the twenty-aughts, the trail did not open until 2018. Here's what happened:

  • Right-of-way along Ellerbe Creek northeast of the tunnel was donated in the 1990s by the shopping centers on its east side.
  • The tunnel itself was built during the remodeling of I-85 sometime between 2003 and 2009 (circa 2005, but not sure of exact year).
  • The trail's design phase was complete by 2010-07-15, but no funding for construction was available.
  • By the time construction funding was first available, the course of the stream had shifted so that the planned path route caused environmental issues and had to be re-planned.
    • New (as of 2014) water-quality rules were also a barrier to construction.
  • A new route was designed, construction funding was obtained, and the section was open by 2018-03-04.

Navigation

Earth: United States: North Carolina: Durham: West Ellerbe Creek Trail

Connections

Sections

Links

Reference

Posts

News