Difference between revisions of "West Ellerbe Creek Trail"

from HTYP, the free directory anyone can edit if they can prove to me that they're not a spambot
Jump to navigation Jump to search
m (using templates for some links)
(Reference: BPAC link)
Line 23: Line 23:
  
 
A longer section continuing along the creek through Westover Park, across Guess Road, under [[I-85]], and connecting with the main [[Ellerbe Creek Trail]] has been designed but not yet built. It will run through a tunnel under [[I-85]] which was built during highway widening circa 2005. Right-of-way along the creek was donated in the 1990s by the shopping centers on its east side, but the creek shifted in the years before funding was available to build the trail. New water-quality rules are currently (2014) a barrier to construction.
 
A longer section continuing along the creek through Westover Park, across Guess Road, under [[I-85]], and connecting with the main [[Ellerbe Creek Trail]] has been designed but not yet built. It will run through a tunnel under [[I-85]] which was built during highway widening circa 2005. Right-of-way along the creek was donated in the 1990s by the shopping centers on its east side, but the creek shifted in the years before funding was available to build the trail. New water-quality rules are currently (2014) a barrier to construction.
==News==
+
==Links==
 +
===Reference===
 +
* [http://www.bikewalkdurham.org/dost/TrailWebPages/WEllerbeCrTr.html Durham Bicycle and Pedestrian Advisory Commission] (BPAC)
 +
===News===
 
* '''2014-02-11''' [http://www.thedurhamnews.com/2014/02/11/3608983/durham-greenway-could-be-condemnation.html Durham greenway could be condemnation bound]: "...the owners of the Bed, Bath and Beyond shopping center and Costco land already donated easements, back in the 1990s. The catch is, since then the creek has meandered to a new course and the old easements are now in buffer zones where new water-quality rules prohibit any construction."
 
* '''2014-02-11''' [http://www.thedurhamnews.com/2014/02/11/3608983/durham-greenway-could-be-condemnation.html Durham greenway could be condemnation bound]: "...the owners of the Bed, Bath and Beyond shopping center and Costco land already donated easements, back in the 1990s. The catch is, since then the creek has meandered to a new course and the old easements are now in buffer zones where new water-quality rules prohibit any construction."
 
* '''2007-06-06''' [http://www.bullcityrising.com/2007/06/act_now_help_co.html Act now: Help connect the North-South & W. Ellerbe Creek Greenways]
 
* '''2007-06-06''' [http://www.bullcityrising.com/2007/06/act_now_help_co.html Act now: Help connect the North-South & W. Ellerbe Creek Greenways]

Revision as of 21:56, 1 June 2014

Navigation

Earth: United States: North Carolina: Durham: West Ellerbe Creek Trail

Connections

Sections

About

West Ellerbe Creek Trail is a bicycle/pedestrian trail in Durham, NC that currently runs from Perennial Drive (off Albany Street near the eastern edge of Hillandale Golf Course) through Indian Trail Park east-northeast along the western portion of Ellerbe Creek to Maryland Avenue (the western edge of the very small Westover Park).

A longer section continuing along the creek through Westover Park, across Guess Road, under I-85, and connecting with the main Ellerbe Creek Trail has been designed but not yet built. It will run through a tunnel under I-85 which was built during highway widening circa 2005. Right-of-way along the creek was donated in the 1990s by the shopping centers on its east side, but the creek shifted in the years before funding was available to build the trail. New water-quality rules are currently (2014) a barrier to construction.

Links

Reference

News