design to cost: Difference between revisions

from HTYP, the free directory anyone can edit if they can prove to me that they're not a spambot
Hkhenson (talk | contribs)
No edit summary
improvements from temp HTYP
Line 1: Line 1:
[[category:terminology]]"[[design to cost|Design to cost]] is a [[management]] strategy and supporting methodologies to achieve an affordable product by treating target cost as an independent design parameter that needs to be achieved during the development of a product." [http://www.npd-solutions.com/dtc.html]
<hide>
[[category:terminology]]
[[category:rescued pages]]
[[category:HKH]]
</hide>
"Design to cost is a management strategy and supporting methodologies to achieve an affordable product by treating target cost as an independent design parameter that needs to be achieved during the development of a product." [http://www.npd-solutions.com/dtc.html]


Applications of this methodology include the [[dollar a gallon gasoline]] project.
Applications of this methodology include the dollar a gallon gasoline project.


(Fast links)
(Fast links)


http://htyp.org/Dollar_a_gallon_gasoline
* [[Dollar a gallon gasoline]]
* [[Penny a kWh]]
* [[Hundred dollars a kg]]
* [[Miller's method]]
* http://www.theoildrum.com/node/5485
* http://www.theoildrum.com/node/7898 (Recent discussion and details)
* [[Mining Asteroids]] (Asteroid mining is a natural outgrowth of mining for power satellite parts.)


http://htyp.org/Penny_a_kWh
If you came here from an old business card, the email address is no longer valid, use Keith Henson <hkeithhenson@gmail.com>
 
http://htyp.org/Hundred_dollars_a_kg
 
http://htyp.org/Miller%27s_method
 
http://www.theoildrum.com/node/5485  (Recent discussion and details)
 
If you came here from a business card, the email address is no longer valid, use Keith Henson <hkeithhenson@gmail.com>

Revision as of 19:38, 11 December 2012

<hide> </hide> "Design to cost is a management strategy and supporting methodologies to achieve an affordable product by treating target cost as an independent design parameter that needs to be achieved during the development of a product." [1]

Applications of this methodology include the dollar a gallon gasoline project.

(Fast links)

If you came here from an old business card, the email address is no longer valid, use Keith Henson <hkeithhenson@gmail.com>